Project Judgment Summary
Page natureEnterprise application plan, no customer on-site acceptance record has been formed
imaging inputlaser line scan
main outputGlue path width, height, center, cross-sectional area, glue break position and missing measurement status
Prerequisites for implementationGlue strip and base contours, positions along the route, real glue materials, and normal and abnormal samples
Current status:Application plan, no customer on-site acceptance record has been formed
Algorithm processing and output
Base positioning → Strip section segmentation → Width and height/center/area calculation → Continuity along the way and identification of missing measurements.
Output results: width and height curve, offset, glue break position and length; volume is only calculated when the boundary, base and coverage are complete.
Implementation and verification
Establish formulas according to adhesive materials and substrates, adapt to contour input, scan synchronization, exception output and traceability reports.
Verification method: compare dimensions with independent profiler/section reference, check missed detections/false alarms according to abnormality categories; test transparency, rotation angle and speed change separately.
Industry public information reference
The following content is used to illustrate the systematic division of labor of similar tasks in public industry materials. The original project does not belong to Jishi Technology, and the original data parameters are not converted into the performance commitment of this page.
Third-party public information · Micro-EpsilonMicro-Epsilon: automotive glass trim glue path inspection
The original application data describes the use of scanCONTROL to measure the height, width and relative position of the automotive glass trim strips, and then form a tolerance result.
References to this program:The glue path algorithm should simultaneously define the base, position and cross-section amount, rather than just determining whether there is glue; the real material and reflection conditions are still project inputs.
Reference boundaries:The resolution/measurement frequency of the original data is not cited as our own parameters, nor is the glue path geometry inspection written as proof of sealing or bonding strength.
View original public information →
Enterprise project promotion and acceptance
- scope confirmationClarify the objects, workstations, inputs, outputs, units, interfaces and abnormal conditions that must be covered.
- Sample verificationUse representative normal and abnormal samples to establish a baseline and record what works, what fails, and data gaps.
- Development joint debuggingComplete the algorithm, calibration, interface and equipment adaptation according to the approved scope, and retain the version, parameters and abnormal status.
- Item acceptanceUse independent samples and reference value retests to confirm errors, detection, tempo, stability and deliverables respectively.