Equipment Projects and Development Scope
The following projects can be broken down into visual subsystems or complete machine prototypes within an agreed range. First confirm the existing core components, samples and target outputs, and then determine the development content of circuits, controls, structures, algorithms and software.
Development of dynamic particle image analyzer
- Development Scope
- Finished product sample supply interface, moving particle collection, profile, particle size distribution and statistics
- Project Inputs
- Sample supply system, particle size reference and sampling representativeness
Related Engineering Services
Development of static powder morphology analyzer
- Development Scope
- Sample stage, scanning splicing, particle morphology parameters and result review
- Project Inputs
- Sample preparation methods, microscopy systems and reference samples
Related Engineering Services
Development of fiber morphology analysis equipment
- Development Scope
- Microscopic acquisition, overlay processing, length diameter curvature and statistical software
- Project Inputs
- Sample preparation, fiber references and measurement methods
Related Engineering Services
Development of filter membrane pollution particle inspection equipment
- Development Scope
- Filter scanning, particle classification, size counting and inspection area traceability
- Project Inputs
- Filter membranes, sample stages and particle determination rules
Related Engineering Services
Development of sedimentation and suspended particle observation equipment
- Development Scope
- Vessel acquisition, trajectories, settling fronts, concentration proxies and time recording
- Project Inputs
- Transparent test chamber, reference sampling and imaging conditions
Related Engineering Services
Development of automatic scanning equipment for particle capture plates
- Development Scope
- Capture plate positioning, partition collection, adhesion processing, counting and batch reporting
- Project Inputs
- Capture media, tooling and reference counting
Related Engineering Services
Responsibilities and Deliverables
| Development Stage | Deliverables | Items to Confirm |
|---|
| Requirements and system interfaces | Equipment tasks, inputs and outputs, interfaces and test requirements | Scope of responsibility for customer's existing systems and supplier components |
| Design and software development | Agreed circuitry, structure, firmware, algorithm or application | Actual design scope, source file rights and third-party licenses |
| Prototype and engineering joint debugging | Agreed configured prototype, parameters, construction and installation information | Number of prototypes, institutional conditions and on-site joint debugging arrangements |
| Validation and technical handover | Configuration list, test records, problem handling and usage instructions | Reference methods, judgment standards and subsequent maintenance scope |
Verification and Acceptance
Verify sample preparation and sampling representativeness, effective imaging area, scale calibration, overlapping particle separation and manual counting differences. The definition of image particle size is recorded separately from the particle size definitions of other detection methods.
Define the samples, target configuration, reference values, operating conditions and acceptance method before testing. Retain normal results, failure cases, version information, known limitations and retest records in the delivery documentation.
Enterprise Project Questions
With only off-the-shelf instruments or cameras, can software and interface development be commissioned?
A project can be limited to acquisition, control interfaces, algorithms or application software for an existing device. Provide the model, protocol or SDK, sample data and access rights so that the available functions can be checked first.
Does device development include all mechanical, optical and manufacturing work?
The project documents define each development responsibility. Precision motion, specialist optics, excitation, radiation sources and other core systems may be supplied by the customer or a specialist vendor. Prototype development and volume manufacturing are agreed separately.
How Are Acceptance Criteria Defined for These Equipment Projects?
Verify sample preparation and sampling representativeness, effective imaging area, scale calibration, overlapping particle separation and manual counting differences. The definition of image particle size is recorded separately from the particle size definitions of other detection methods.
Can design materials and maintainable source code be delivered at the same time?
Agree which circuit files, mechanical drawings, firmware, algorithms, software and build instructions will be delivered during requirements definition. Check third-party licenses and define delivery rights and scope in the project documents.
Project Enquiry
Provide Equipment and Sample Information to Define the Development Scope
Particle, Fiber and Cleanliness Analysis Equipment Development
Please describe the purpose of the equipment, existing systems, cameras and interfaces, target output, reference samples, prototype quantity and design data delivery requirements.
Phone: 13910119357
xuzhiyang0928@gmail.com