Enterprise Application Area D51

Infrared vision development services for waste, environmental and pollution monitoring

For "waste, environmental protection and pollution monitoring" related equipment manufacturers, system integrators and enterprise R&D, it provides infrared data evaluation, algorithm development, equipment/platform integration and test acceptance, covering 8 types of enterprise application scenarios.

Service scope and implementation plan

direction numberD51
Demand scenario8 items
main inputLWIR/TIR L2/L4; MWIR/LWIR L2/L3;
Typical routeT05、T08、T17、T13、T12、T14、T09、T20

The project scope is determined based on samples, equipment, working conditions and written indicators; general modules, special models and multi-sensor integration are configured according to the evaluation results.

Application scenarios and development content

IR401

Landfill self-heating, underground fires and gas hot spots

Minimum input and technical route
LWIR/TIR L2/L4;T05+T08
target output
Hot spots, trends and review coordinates
Implementation
Partially reusable
critical acceptance
Compare with borehole temperature/gas detection
IR402

Waste incinerator and flue thermal status monitoring

Minimum input and technical route
MWIR/LWIR L2/L3;T17
target output
Furnace body/flue temperature and abnormalities
Implementation
High temperature model required
critical acceptance
Compare with process temperature measurement/emission records
IR403

Recycling plastics, paper and fabrics SWIR Material sorting

Minimum input and technical route
SWIR/Hyperspectral L5;T13
target output
Material class, contamination and sorting signals
Implementation
Need sample library
critical acceptance
Recall, mixture/stain layering per category
IR404

Black plastic NIR/SWIR classification feasibility screening

Minimum input and technical route
SWIR L5;T12+T13
target output
Separable/non-separable materials and candidate categories
Implementation
Band test required
critical acceptance
Spectral separability, batch external validation
IR405

Remote sensing of sewage outfalls and thermal pollution plumes

Minimum input and technical route
TIR L2/L4;T14
target output
Exhaust heat trace, range and coordinates
Implementation
Required water temperature/flow true value
critical acceptance
Temperature RMSE, plume IoU
IR406

Compost fermentation and organic windrow temperature uniformity

Minimum input and technical route
LWIR L2/L3;T05
target output
Candidates for surface hot zone and turning pile requirements
Implementation
Need deep probe
critical acceptance
Versus internal temperature/oxygen content
IR407

VOC/methane/SF₆ and other emissions OGI monitoring

Minimum input and technical route
Special OGI L3;T09
target output
Air plume incidents, equipment and evidence
Implementation
One gas and one configuration are required
critical acceptance
Controlled release, environmental stratification, false positives
IR408

Environmental inspection multi-source evidence and GIS archiving

Minimum input and technical route
IR+Visible+Sensor L4;T14+T20
target output
Exception, coordinates, time and review records
Implementation
Need system integration
critical acceptance
Data integrity, coordinate error, auditability

Information required before project evaluation

  • Target equipment/object, site conditions, business processes and follow-up actions to be taken
  • Infrared camera, lens, spectral band, installation distance, field of view, resolution and data interface
  • Original samples and collection parameters under normal, abnormal, boundary and interference conditions
  • Reference truth values and annotation specifications for temperatures, parts, states, or events
  • Target platform, network, interface, storage, latency and operating resource constraints
  • False positives, missed negatives, manual review, linkage, failure handling and acceptance thresholds

Implementation and delivery methods

  1. Project input confirmationCheck camera, spectral band, bit depth, SDK, environmental conditions, sample and acceptance true value.
  2. Sample verificationVerify key processing links, applicable conditions and abnormal working conditions, and determine the development scope and acceptance methods.
  3. Algorithm development and integrationImplement data parsing, algorithms, quality gating, interfaces and target platform deployment.
  4. Test acceptance and handoverRetest according to the agreed test set and target platform, and hand over the deliverables, test results and applicable conditions.
  • Requirements and technical solutions, input and output and interface field definitions
  • Algorithm library, model or SDK/API; delivery form is confirmed in the project plan
  • Sample program, parameter configuration, error status and calling instructions
  • Test set version, indicator definition, stratification results and failed sample records
  • Target platform adaptation, resource usage and running delay records
  • Version, dependencies, license, reproduction steps and applicable conditions description

Acceptance design

Each scenario establishes independent test cases according to "key acceptance". When sharing models across scenarios, results are reported separately for each scenario, distance, load, environment, and target size, supplemented by overall statistics.

When high-risk alarms or controls are involved, the algorithm output is used for review or linkage judgment; safety functions, regulatory responsibilities, and automatic disposal require separate design and acceptance.

Frequently Asked Questions for Enterprise Customers

Can I purchase directly based on one of the scenes?

Can be evaluated first as a separate work package. The formal scope should describe the device, data, target objects, environment, interfaces, delivery form, and acceptance thresholds.

Can it be started when there are no abnormal samples?

The data interface, normal baseline, acquisition plan and simulation/controlled test design can be completed first; the abnormal detection rate and fault classification effect can be evaluated after obtaining sufficient abnormal true values.

Can the algorithm directly trigger alarms or equipment actions?

Duration, deduplication, quality gating, manual review, communication failure and safety interlocking need to be designed based on business risks. High-risk actions should be activated after completion of independent safety mechanisms and on-site acceptance.

Project consultation

Define the Development Scope with Samples and Device Requirements

Infrared vision development services for waste, environmental and pollution monitoring

Please describe the task object, original picture or video, target indicators, device platform, interface and sample situation.

Phone: 13910119357
xuzhiyang0928@gmail.com

The information filled in will only be used for evaluation and contact for this project. Please do not submit unauthorized personal information or sensitive data.