Enterprise Application Area D50

Geology, mining, mineral and resource exploration infrared vision development services

Targeted at "geology, mining, mineral and resource exploration" related equipment manufacturers, system integrators and enterprise R&D, it provides infrared data evaluation, algorithm development, equipment/platform integration and test acceptance, covering 8 types of enterprise application scenarios.

Service scope and implementation plan

direction numberD50
Demand scenario8 items
main inputHyperspectral L5; VNIR/SWIR L5; SWIR/Hyperspectral L5;
Typical routeT13、T14、T05、T08、T02、T07、T19、T04

The project scope is determined based on samples, equipment, working conditions and written indicators; general modules, special models and multi-sensor integration are configured according to the evaluation results.

Application scenarios and development content

IR393

SWIR Spectral Classification of Minerals and Alteration Types

Minimum input and technical route
Hyperspectral L5;T13+T14
target output
Mineral class, abundance and confidence
Implementation
Requires spectral library/sample true value
critical acceptance
Spectral angle, Recall per class, instrument migration
IR394

Automatic cataloging of rock core hyperspectral

Minimum input and technical route
VNIR/SWIR L5;T13
target output
Lithology/Mineral Distribution and Depth Index
Implementation
Need core true value
critical acceptance
Compare with geological catalog/XRD
IR395

Ore grade and gangue SWIR sorting

Minimum input and technical route
SWIR/Hyperspectral L5;T13
target output
Grade/category and sorting signals
Implementation
Need to test the true value
critical acceptance
Blind test RMSE, sorting purity/recovery rate
IR396

Self-heating and fire point monitoring of mine piles and coal piles

Minimum input and technical route
LWIR/TIR L2/L3;T05+T08
target output
Hot spots, growth trends and review coordinates
Implementation
Partially reusable
critical acceptance
Compared with internal probe/site control, lead time
IR397

Candidates for water seepage and thermal inertia anomalies in open-pit mine slopes

Minimum input and technical route
TIR L2/L4;T02+T14
target output
Anomalies, change and GIS
Implementation
Requires geological/hydrological truth values
critical acceptance
Compare with monitoring holes/inspection; do not judge stability separately
IR398

Remote sensing of geothermal anomalies, hot springs and volcanic hot areas

Minimum input and technical route
TIR L4/L5;T14
target output
Thermal anomalies, changes, and geographic layers
Implementation
Requires atmospheric/terrain correction
critical acceptance
Compare with ground temperature/geological survey
IR399

Night vision of personnel, vehicles and heat sources in underground mines

Minimum input and technical route
LWIR L3;T07+T19
target output
Goals, trajectories and risk events
Implementation
Need underground data
critical acceptance
Dust/Humidity/Occlusion Layering
IR400

Thermal inspection of mine conveying, crushing and electrical equipment

Minimum input and technical route
LWIR L2/L3;T04+T05
target output
Equipment temperature, blockage and abnormalities
Implementation
Partially reusable
critical acceptance
Compare with load/maintenance records

Information required before project evaluation

  • Target equipment/object, site conditions, business processes and follow-up actions to be taken
  • Infrared camera, lens, spectral band, installation distance, field of view, resolution and data interface
  • Original samples and collection parameters under normal, abnormal, boundary and interference conditions
  • Reference truth values and annotation specifications for temperatures, parts, states, or events
  • Target platform, network, interface, storage, latency and operating resource constraints
  • False positives, missed negatives, manual review, linkage, failure handling and acceptance thresholds

Implementation and delivery methods

  1. Project input confirmationCheck camera, spectral band, bit depth, SDK, environmental conditions, sample and acceptance true value.
  2. Sample verificationVerify key processing links, applicable conditions and abnormal working conditions, and determine the development scope and acceptance methods.
  3. Algorithm development and integrationImplement data parsing, algorithms, quality gating, interfaces and target platform deployment.
  4. Test acceptance and handoverRetest according to the agreed test set and target platform, and hand over the deliverables, test results and applicable conditions.
  • Requirements and technical solutions, input and output and interface field definitions
  • Algorithm library, model or SDK/API; delivery form is confirmed in the project plan
  • Sample program, parameter configuration, error status and calling instructions
  • Test set version, indicator definition, stratification results and failed sample records
  • Target platform adaptation, resource usage and running delay records
  • Version, dependencies, license, reproduction steps and applicable conditions description

Acceptance design

Each scenario establishes independent test cases according to "key acceptance". When sharing models across scenarios, results are reported separately for each scenario, distance, load, environment, and target size, supplemented by overall statistics.

When high-risk alarms or controls are involved, the algorithm output is used for review or linkage judgment; safety functions, regulatory responsibilities, and automatic disposal require separate design and acceptance.

Frequently Asked Questions for Enterprise Customers

Can I purchase directly based on one of the scenes?

Can be evaluated first as a separate work package. The formal scope should describe the device, data, target objects, environment, interfaces, delivery form, and acceptance thresholds.

Can it be started when there are no abnormal samples?

The data interface, normal baseline, acquisition plan and simulation/controlled test design can be completed first; the abnormal detection rate and fault classification effect can be evaluated after obtaining sufficient abnormal true values.

Can the algorithm directly trigger alarms or equipment actions?

Duration, deduplication, quality gating, manual review, communication failure and safety interlocking need to be designed based on business risks. High-risk actions should be activated after completion of independent safety mechanisms and on-site acceptance.

Project consultation

Define the Development Scope with Samples and Device Requirements

Geology, mining, mineral and resource exploration infrared vision development services

Please describe the task object, original picture or video, target indicators, device platform, interface and sample situation.

Phone: 13910119357
xuzhiyang0928@gmail.com

The information filled in will only be used for evaluation and contact for this project. Please do not submit unauthorized personal information or sensitive data.