Enterprise application areas D48

Land, urban and ecological remote sensing infrared vision development services

For "land, urban and ecological remote sensing" related equipment manufacturers, system integrators and enterprise R&D, it provides infrared data evaluation, algorithm development, equipment/platform integration and test acceptance, covering 8 types of enterprise application scenarios.

Service scope and implementation plan

direction numberD48
Demand scenario8 items
main inputSatellite/airborne TIR L5; TIR+multispectral+GIS; TIR+meteorology+multispectral; day and night TIR+multispectral
Typical routeT14、T08、T13、T20

The project scope is determined based on samples, equipment, working conditions and written indicators; general modules, special models and multi-sensor integration are configured according to the evaluation results.

Application scenarios and development content

IR377

Surface temperature LST retrieval and heat island analysis

Minimum input and technical route
Satellite/airborne TIR L5;T14
target output
LST, heat island intensity and mass layer
Implementation
Requires atmosphere/emissivity model
critical acceptance
Compare with ground station/high-resolution images, RMSE
IR378

Urban thermal risk, green space and impervious surface associations

Minimum input and technical route
TIR+multispectral+GIS;T14
target output
Thermal risk zoning and related statistics
Implementation
Requires spatio-temporal statistics
critical acceptance
Consistent time/space scale, explanation of confounding factors
IR379

Evapotranspiration and farmland water consumption estimation

Minimum input and technical route
TIR+meteorology+multispectral;T14
target output
ET estimates and plot statistics
Implementation
energy balance model
critical acceptance
Contrast with eddy covariance/water balance
IR380

Soil moisture and drought thermal inertia proxies

Minimum input and technical route
Day and night TIR+multispectral;T14
target output
Thermal inertia/humidity proxies and changes
Implementation
Need soil true value
critical acceptance
Versus probe/sampling control, soil type stratification
IR381

Remote sensing of fires, lava and industrial heat sources

Minimum input and technical route
MWIR/TIR;T08+T14
target output
Thermal anomalies, radiant power proxies and changes
Implementation
Requires saturation/atmospheric correction
critical acceptance
Versus event/ground station
IR382

Multispectral analysis of snow, ice, frozen soil and melt boundaries

Minimum input and technical route
NIR/SWIR/TIR;T14
target output
Snow and ice index, surface temperature and change area
Implementation
Requires atmospheric/terrain correction
critical acceptance
Compare with site/high score images
IR383

Mine area, tailings and surface disturbance change detection

Minimum input and technical route
SWIR/TIR multi-phase;T13+T14
target output
Material/Temperature Anomalies and Changes Layer
Implementation
ground truth required
critical acceptance
Registration error, change area IoU
IR384

Multi-source satellite, drone and ground thermal image scale fusion

Minimum input and technical route
L4/L5;T14+T20
target output
Fusion layers, scale transformations and uncertainty
Implementation
Requires spatiotemporal model
critical acceptance
Cross-scale error, temporal matching, and quality layers

Information required before project evaluation

  • Target equipment/object, site conditions, business processes and follow-up actions to be taken
  • Infrared camera, lens, spectral band, installation distance, field of view, resolution and data interface
  • Original samples and collection parameters under normal, abnormal, boundary and interference conditions
  • Reference truth values and annotation specifications for temperatures, parts, states, or events
  • Target platform, network, interface, storage, latency and operating resource constraints
  • False positives, missed negatives, manual review, linkage, failure handling and acceptance thresholds

Implementation and delivery methods

  1. Project input confirmationCheck camera, spectral band, bit depth, SDK, environmental conditions, sample and acceptance true value.
  2. Sample verificationVerify key processing links, applicable conditions and abnormal working conditions, and determine the development scope and acceptance methods.
  3. Algorithm development and integrationImplement data parsing, algorithms, quality gating, interfaces and target platform deployment.
  4. Test acceptance and handoverRetest according to the agreed test set and target platform, and hand over the deliverables, test results and applicable conditions.
  • Requirements and technical solutions, input and output and interface field definitions
  • Algorithm library, model or SDK/API; delivery form is confirmed in the project plan
  • Sample program, parameter configuration, error status and calling instructions
  • Test set version, indicator definition, stratification results and failed sample records
  • Target platform adaptation, resource usage and running delay records
  • Version, dependencies, license, reproduction steps and applicable conditions description

Acceptance design

Each scenario establishes independent test cases according to "key acceptance". When sharing models across scenarios, results are reported separately for each scenario, distance, load, environment, and target size, supplemented by overall statistics.

When high-risk alarms or controls are involved, the algorithm output is used for review or linkage judgment; safety functions, regulatory responsibilities, and automatic disposal require separate design and acceptance.

Frequently Asked Questions for Enterprise Customers

Can I purchase directly based on one of the scenes?

Can be evaluated first as a separate work package. The formal scope should describe the device, data, target objects, environment, interfaces, delivery form, and acceptance thresholds.

Can it be started when there are no abnormal samples?

The data interface, normal baseline, acquisition plan and simulation/controlled test design can be completed first; the abnormal detection rate and fault classification effect can be evaluated after obtaining sufficient abnormal true values.

Can the algorithm directly trigger alarms or equipment actions?

Duration, deduplication, quality gating, manual review, communication failure and safety interlocking need to be designed based on business risks. High-risk actions should be activated after completion of independent safety mechanisms and on-site acceptance.

Project consultation

Define the Development Scope with Samples and Device Requirements

Land, urban and ecological remote sensing infrared vision development services

Please describe the task object, original picture or video, target indicators, device platform, interface and sample situation.

Phone: 13910119357
xuzhiyang0928@gmail.com

The information filled in will only be used for evaluation and contact for this project. Please do not submit unauthorized personal information or sensitive data.