Service scope and implementation plan
direction numberD47
Demand scenario8 items
main inputLWIR L2/L3; RGB-LWIR L4;
Typical routeT16、T06、T19、T20
The project scope is determined based on samples, equipment, working conditions and written indicators; general modules, special models and multi-sensor integration are configured according to the evaluation results.
Application scenarios and development content
IR369Changes in muscle group surface temperature before and after exercise
- Minimum input and technical route
- LWIR L2/L3;T16
- target output
- Muscle group ROI, temperature difference and recovery curve
- Implementation
- Need research design
- critical acceptance
- Environment/exercise intensity/skin condition control, repeatability
IR370Asymmetric thermal characteristics of left and right limb loads
- Minimum input and technical route
- LWIR L2/L3;T16
- target output
- Symmetry indicators and trends
- Implementation
- Requires clinical/exercise truth
- critical acceptance
- Compare with force platform/myoelectricity/action data
IR371Recording of temperature distribution in cold and hot compress areas
- Minimum input and technical route
- LWIR L2/L3;T16
- target output
- Coverage area, temperature profile and recovery time
- Implementation
- Partially reusable
- critical acceptance
- Compare with contact temperature and equipment parameters
IR372Synchronous analysis of rehabilitation actions and thermal responses
- Minimum input and technical route
- RGB-LWIR L4;T06+T16
- target output
- Posture, movement phases and thermal changes
- Implementation
- Multimodal data required
- critical acceptance
- Time synchronization, action/ROI alignment error
IR373Research on thermal abnormalities caused by contact compression in wheelchairs, prostheses and braces
- Minimum input and technical route
- LWIR L2/L3;T16
- target output
- Contact zone hot spot and duration
- Implementation
- Required pressure/clinical truth value
- critical acceptance
- Versus pressure pad/skin check
IR374Workstation, Tool and Repetitive Action Thermal Load Studies
- Minimum input and technical route
- LWIR L2/L3;T16+T19
- target output
- Muscle group surface thermal changes and task phases
- Implementation
- Ergonomics study required
- critical acceptance
- Compare with task/myoelectric/subjective scale
IR375Research on heat dissipation of competitive equipment and thermal and moisture comfort of clothing
- Minimum input and technical route
- LWIR L2/L3+ environment sensing;T16
- target output
- Surface temperature, heat dissipation zone and time profile
- Implementation
- Required materials/human testing
- critical acceptance
- Compare with heat flow/temperature and humidity/standard dummy
IR376Human body thermal imaging data de-identification, consent and retention management
- Minimum input and technical route
- arbitrary;T20
- target output
- Data permissions, desensitization and audit logging
- Implementation
- Privacy engineering required
- critical acceptance
- Re-identification of risks, permission testing, deletion and verification
Implementation and delivery methods
- Project input confirmationCheck camera, spectral band, bit depth, SDK, environmental conditions, sample and acceptance true value.
- Sample verificationVerify key processing links, applicable conditions and abnormal working conditions, and determine the development scope and acceptance methods.
- Algorithm development and integrationImplement data parsing, algorithms, quality gating, interfaces and target platform deployment.
- Test acceptance and handoverRetest according to the agreed test set and target platform, and hand over the deliverables, test results and applicable conditions.
- Requirements and technical solutions, input and output and interface field definitions
- Algorithm library, model or SDK/API; delivery form is confirmed in the project plan
- Sample program, parameter configuration, error status and calling instructions
- Test set version, indicator definition, stratification results and failed sample records
- Target platform adaptation, resource usage and running delay records
- Version, dependencies, license, reproduction steps and applicable conditions description
Acceptance design
Each scenario establishes independent test cases according to "key acceptance". When sharing models across scenarios, results are reported separately for each scenario, distance, load, environment, and target size, supplemented by overall statistics.
When high-risk alarms or controls are involved, the algorithm output is used for review or linkage judgment; safety functions, regulatory responsibilities, and automatic disposal require separate design and acceptance.
Frequently Asked Questions for Enterprise Customers
Can I purchase directly based on one of the scenes?
Can be evaluated first as a separate work package. The formal scope should describe the device, data, target objects, environment, interfaces, delivery form, and acceptance thresholds.
Can it be started when there are no abnormal samples?
The data interface, normal baseline, acquisition plan and simulation/controlled test design can be completed first; the abnormal detection rate and fault classification effect can be evaluated after obtaining sufficient abnormal true values.
Can the algorithm directly trigger alarms or equipment actions?
Duration, deduplication, quality gating, manual review, communication failure and safety interlocking need to be designed based on business risks. High-risk actions should be activated after completion of independent safety mechanisms and on-site acceptance.