Service scope and implementation plan
direction numberD44
Demand scenario8 items
main inputNIR/SWIR L5; multi/hyperspectral L5;
Typical routeT12、T13、T05、T04、T19
The project scope is determined based on samples, equipment, working conditions and written indicators; general modules, special models and multi-sensor integration are configured according to the evaluation results.
Application scenarios and development content
IR345Grain moisture content NIR/SWIR return
- Minimum input and technical route
- NIR/SWIR L5;T12+T13
- target output
- Moisture content and confidence interval
- Implementation
- Need drying method true value
- critical acceptance
- Cross-variety/batch external validation RMSE
IR346Spectral sorting of grain mildew, insect damage and foreign matter
- Minimum input and technical route
- Multi/hyperspectral L5;T13
- target output
- Categories, abnormal particles and sorting signals
- Implementation
- Need experts/test true value
- critical acceptance
- Recall and missing score rate for each category
IR347Grain pile surface self-heating and dew condensation monitoring
- Minimum input and technical route
- LWIR L2/L3;T05
- target output
- Hot zones, warming trends and condensation candidates
- Implementation
- Need deep probe
- critical acceptance
- Discover advance; do not substitute surface for internal temperature
IR348Beverage filling temperature and liquid level thermal boundaries
- Minimum input and technical route
- LWIR L2/L3;T04+T19
- target output
- Container, level and temperature
- Implementation
- Requires packaging verification
- critical acceptance
- Liquid level error, temperature P95, beat
IR349Fermentation tank surface temperature and stage abnormalities
- Minimum input and technical route
- LWIR L2/L3;T05
- target output
- Temperature distribution, phases and deviations
- Implementation
- Need process truth value
- critical acceptance
- Compare with tank temperature/batch record
IR350Observation on joint control of dryer material moisture content and outlet temperature
- Minimum input and technical route
- SWIR+LWIR L4;T05+T12
- target output
- Aqueous agents, temperature and fluctuations
- Implementation
- Requires multi-source calibration
- critical acceptance
- Compare with moisture meter/laboratory true value
IR351Powder agglomeration, wet mass and mixture spectrum anomalies
- Minimum input and technical route
- SWIR/Hyperspectral L5;T13
- target output
- Abnormal clumps, categories and areas
- Implementation
- Product spectrum data required
- critical acceptance
- Exception Recall, minimum clump
IR352Oil Oxidation, Blending and Quality NIR Spectroscopic Study
- Minimum input and technical route
- NIR/SWIR spectrum L5;T13
- target output
- Quality/Blending Regression Candidates
- Implementation
- Need chemical truth value
- critical acceptance
- Blind test RMSE, batch/temperature migration
Implementation and delivery methods
- Project input confirmationCheck camera, spectral band, bit depth, SDK, environmental conditions, sample and acceptance true value.
- Sample verificationVerify key processing links, applicable conditions and abnormal working conditions, and determine the development scope and acceptance methods.
- Algorithm development and integrationImplement data parsing, algorithms, quality gating, interfaces and target platform deployment.
- Test acceptance and handoverRetest according to the agreed test set and target platform, and hand over the deliverables, test results and applicable conditions.
- Requirements and technical solutions, input and output and interface field definitions
- Algorithm library, model or SDK/API; delivery form is confirmed in the project plan
- Sample program, parameter configuration, error status and calling instructions
- Test set version, indicator definition, stratification results and failed sample records
- Target platform adaptation, resource usage and running delay records
- Version, dependencies, license, reproduction steps and applicable conditions description
Acceptance design
Each scenario establishes independent test cases according to "key acceptance". When sharing models across scenarios, results are reported separately for each scenario, distance, load, environment, and target size, supplemented by overall statistics.
When high-risk alarms or controls are involved, the algorithm output is used for review or linkage judgment; safety functions, regulatory responsibilities, and automatic disposal require separate design and acceptance.
Frequently Asked Questions for Enterprise Customers
Can I purchase directly based on one of the scenes?
Can be evaluated first as a separate work package. The formal scope should describe the device, data, target objects, environment, interfaces, delivery form, and acceptance thresholds.
Can it be started when there are no abnormal samples?
The data interface, normal baseline, acquisition plan and simulation/controlled test design can be completed first; the abnormal detection rate and fault classification effect can be evaluated after obtaining sufficient abnormal true values.
Can the algorithm directly trigger alarms or equipment actions?
Duration, deduplication, quality gating, manual review, communication failure and safety interlocking need to be designed based on business risks. High-risk actions should be activated after completion of independent safety mechanisms and on-site acceptance.