Enterprise Application Area D42

Wildlife, ecological and biological survey infrared vision development services

For "wildlife, ecological and biological survey" related equipment manufacturers, system integrators and enterprise R&D, it provides infrared data evaluation, algorithm development, equipment/platform integration and test acceptance, covering 8 types of enterprise application scenarios.

Service scope and implementation plan

direction numberD42
Demand scenario8 items
main inputNIR/LWIR images/videos; NIR/LWIR L3;
Typical routeT07、T19、T14、T02、T16、T20

The project scope is determined based on samples, equipment, working conditions and written indicators; general modules, special models and multi-sensor integration are configured according to the evaluation results.

Application scenarios and development content

IR329

Infrared camera trap null trigger filtering

Minimum input and technical route
NIR/LWIR images/videos;T07
target output
Animal/null frames and trigger quality
Implementation
Species data required
critical acceptance
Null trigger filtering rate, animal missing deletion rate
IR330

Species identification, abundance and activity rhythm statistics

Minimum input and technical route
NIR/LWIR L3;T07+T19
target output
Species, abundance, timing and trajectory
Implementation
Requires expert annotation
critical acceptance
Recall for each type, Rejection of unknown species
IR331

Long-distance thermal imaging survey of nocturnal animals

Minimum input and technical route
LWIR L3/L4;T07+T14
target output
Animal candidates, coordinates and observation records
Implementation
Need field data
critical acceptance
Distance/vegetation layering, detection rate
IR332

Study on bird/bat flight trajectories and wind turbine collision risk

Minimum input and technical route
MWIR/LWIR L3;T07+T19
target output
Trajectories, speeds and risk zones
Implementation
Need high-speed long-distance system
critical acceptance
Trajectory integrity rate, distance error
IR333

Observation of thermal anomalies in nests, caves and breeding grounds

Minimum input and technical route
LWIR L2/L3;T02+T07
target output
Hot targets, active times and areas
Implementation
Need ecological explanation
critical acceptance
Compare with on-site observation; species can be determined directly without hot spots
IR334

Thermography research on animal surface injuries and rehabilitation

Minimum input and technical route
LWIR L2/L3;T16
target output
Symmetry, local temperature differences and recovery curves
Implementation
Veterinary Ethics and Truth Values Needed
critical acceptance
Reproducibility, diagnostic control; ancillary research only
IR335

Survey of sea turtles, seals and other coastal individuals at night

Minimum input and technical route
LWIR L3/L4;T07+T14
target output
Individuals, quantities, trajectories and coordinates
Implementation
Species data required
critical acceptance
Counting Error, Target Recall
IR336

Data quality and drift management for long-term ecological infrared monitoring

Minimum input and technical route
L3;T20
target output
Camera health, seasonal drift and comparable data
Implementation
Requires engineering implementation
critical acceptance
Online rate, drift detection time, cross-season consistency

Information required before project evaluation

  • Target equipment/object, site conditions, business processes and follow-up actions to be taken
  • Infrared camera, lens, spectral band, installation distance, field of view, resolution and data interface
  • Original samples and collection parameters under normal, abnormal, boundary and interference conditions
  • Reference truth values and annotation specifications for temperatures, parts, states, or events
  • Target platform, network, interface, storage, latency and operating resource constraints
  • False positives, missed negatives, manual review, linkage, failure handling and acceptance thresholds

Implementation and delivery methods

  1. Project input confirmationCheck camera, spectral band, bit depth, SDK, environmental conditions, sample and acceptance true value.
  2. Sample verificationVerify key processing links, applicable conditions and abnormal working conditions, and determine the development scope and acceptance methods.
  3. Algorithm development and integrationImplement data parsing, algorithms, quality gating, interfaces and target platform deployment.
  4. Test acceptance and handoverRetest according to the agreed test set and target platform, and hand over the deliverables, test results and applicable conditions.
  • Requirements and technical solutions, input and output and interface field definitions
  • Algorithm library, model or SDK/API; delivery form is confirmed in the project plan
  • Sample program, parameter configuration, error status and calling instructions
  • Test set version, indicator definition, stratification results and failed sample records
  • Target platform adaptation, resource usage and running delay records
  • Version, dependencies, license, reproduction steps and applicable conditions description

Acceptance design

Each scenario establishes independent test cases according to "key acceptance". When sharing models across scenarios, results are reported separately for each scenario, distance, load, environment, and target size, supplemented by overall statistics.

When high-risk alarms or controls are involved, the algorithm output is used for review or linkage judgment; safety functions, regulatory responsibilities, and automatic disposal require separate design and acceptance.

Frequently Asked Questions for Enterprise Customers

Can I purchase directly based on one of the scenes?

Can be evaluated first as a separate work package. The formal scope should describe the device, data, target objects, environment, interfaces, delivery form, and acceptance thresholds.

Can it be started when there are no abnormal samples?

The data interface, normal baseline, acquisition plan and simulation/controlled test design can be completed first; the abnormal detection rate and fault classification effect can be evaluated after obtaining sufficient abnormal true values.

Can the algorithm directly trigger alarms or equipment actions?

Duration, deduplication, quality gating, manual review, communication failure and safety interlocking need to be designed based on business risks. High-risk actions should be activated after completion of independent safety mechanisms and on-site acceptance.

Project consultation

Define the Development Scope with Samples and Device Requirements

Wildlife, ecological and biological survey infrared vision development services

Please describe the task object, original picture or video, target indicators, device platform, interface and sample situation.

Phone: 13910119357
xuzhiyang0928@gmail.com

The information filled in will only be used for evaluation and contact for this project. Please do not submit unauthorized personal information or sensitive data.