Enterprise application areas D39

Greenhouse, orchard, facility agriculture and post-harvest infrared vision development services

For "greenhouse, orchard, facility agriculture and post-harvest" related equipment manufacturers, system integrators and enterprise R&D, it provides infrared data evaluation, algorithm development, equipment/platform integration and test acceptance, covering 8 types of enterprise application scenarios.

Service scope and implementation plan

direction numberD39
Demand scenario8 items
main inputTIR L2/L3;
Typical routeT05、T14、T03、T02、T12、T13、T07、T19

The project scope is determined based on samples, equipment, working conditions and written indicators; general modules, special models and multi-sensor integration are configured according to the evaluation results.

Application scenarios and development content

IR305

Online monitoring of greenhouse canopy temperature and water stress

Minimum input and technical route
TIR L2/L3;T05+T14
target output
Plant temperature, stress zones and trends
Implementation
Requires meteorological/irrigation true values
critical acceptance
Compare with leaf water potential/irrigation records
IR306

Greenhouse heating pipes, ventilation and uneven heating and cooling

Minimum input and technical route
LWIR L2/L3;T03+T05
target output
Facility temperature field and abnormal equipment
Implementation
Partially reusable
critical acceptance
Check with environmental sensor/device status
IR307

Risks of night-time freezing damage to flower buds, fruits and leaves of fruit trees

Minimum input and technical route
LWIR L2/L3;T03+T05
target output
Target temperature, hypothermia duration and risk proxy
Implementation
Required varieties/weather models
critical acceptance
Comparison with tissue damage/meteorological truth
IR308

Abnormal heat traces on orchard irrigation lines and emitters

Minimum input and technical route
TIR L2/L4;T02+T14
target output
Exception row/drip tip and coordinates
Implementation
Required environment model
critical acceptance
Versus flow/soil moisture
IR309

Fruit ripeness, sugar content and moisture content SWIR Return

Minimum input and technical route
SWIR/Hyperspectral L5;T12+T13
target output
Maturity/Composition Regression and Intervals
Implementation
Requires laboratory truth value
critical acceptance
External validation by variety/season RMSE
IR310

Bruising, spoilage and internal moisture abnormalities in fruits and vegetables

Minimum input and technical route
SWIR/thermal image L5;T12+T13
target output
Defect areas and categories
Implementation
Need to slice/physical and chemical truth value
critical acceptance
Defect Recall, minimum defect, batch migration
IR311

Postharvest pre-cooling and cooling uniformity

Minimum input and technical route
LWIR L2/L3;T03+T05
target output
Surface temperature profile and uneven cooling
Implementation
Partially reusable
critical acceptance
Compared with core temperature/mass, curve error
IR312

Greenhouse nighttime personnel, equipment and animal safety monitoring

Minimum input and technical route
LWIR L3;T07+T19
target output
Targets, trajectories and area events
Implementation
Scenario data required
critical acceptance
Event Recall, False Alarm/Night

Information required before project evaluation

  • Target equipment/object, site conditions, business processes and follow-up actions to be taken
  • Infrared camera, lens, spectral band, installation distance, field of view, resolution and data interface
  • Original samples and collection parameters under normal, abnormal, boundary and interference conditions
  • Reference truth values and annotation specifications for temperatures, parts, states, or events
  • Target platform, network, interface, storage, latency and operating resource constraints
  • False positives, missed negatives, manual review, linkage, failure handling and acceptance thresholds

Implementation and delivery methods

  1. Project input confirmationCheck camera, spectral band, bit depth, SDK, environmental conditions, sample and acceptance true value.
  2. Sample verificationVerify key processing links, applicable conditions and abnormal working conditions, and determine the development scope and acceptance methods.
  3. Algorithm development and integrationImplement data parsing, algorithms, quality gating, interfaces and target platform deployment.
  4. Test acceptance and handoverRetest according to the agreed test set and target platform, and hand over the deliverables, test results and applicable conditions.
  • Requirements and technical solutions, input and output and interface field definitions
  • Algorithm library, model or SDK/API; delivery form is confirmed in the project plan
  • Sample program, parameter configuration, error status and calling instructions
  • Test set version, indicator definition, stratification results and failed sample records
  • Target platform adaptation, resource usage and running delay records
  • Version, dependencies, license, reproduction steps and applicable conditions description

Acceptance design

Each scenario establishes independent test cases according to "key acceptance". When sharing models across scenarios, results are reported separately for each scenario, distance, load, environment, and target size, supplemented by overall statistics.

When high-risk alarms or controls are involved, the algorithm output is used for review or linkage judgment; safety functions, regulatory responsibilities, and automatic disposal require separate design and acceptance.

Frequently Asked Questions for Enterprise Customers

Can I purchase directly based on one of the scenes?

Can be evaluated first as a separate work package. The formal scope should describe the device, data, target objects, environment, interfaces, delivery form, and acceptance thresholds.

Can it be started when there are no abnormal samples?

The data interface, normal baseline, acquisition plan and simulation/controlled test design can be completed first; the abnormal detection rate and fault classification effect can be evaluated after obtaining sufficient abnormal true values.

Can the algorithm directly trigger alarms or equipment actions?

Duration, deduplication, quality gating, manual review, communication failure and safety interlocking need to be designed based on business risks. High-risk actions should be activated after completion of independent safety mechanisms and on-site acceptance.

Project consultation

Define the Development Scope with Samples and Device Requirements

Greenhouse, orchard, facility agriculture and post-harvest infrared vision development services

Please describe the task object, original picture or video, target indicators, device platform, interface and sample situation.

Phone: 13910119357
xuzhiyang0928@gmail.com

The information filled in will only be used for evaluation and contact for this project. Please do not submit unauthorized personal information or sensitive data.