Enterprise application areas D27

Fire, early stage fire and fire protection facilities infrared vision development services

Targeting equipment manufacturers, system integrators and enterprise R&D related to "fire, early fire and fire protection facilities", it provides infrared data evaluation, algorithm development, equipment/platform integration and test acceptance, covering 8 types of enterprise application scenarios.

Service scope and implementation plan

direction numberD27
Demand scenario8 items
main inputLWIR/MWIR L2/L3; LWIR L3; UAV/Fixed MWIR/LWIR L3/L4; LWIR L2/L3
Typical routeT08、T19、T07、T14、T05、T03、T15

The project scope is determined based on samples, equipment, working conditions and written indicators; general modules, special models and multi-sensor integration are configured according to the evaluation results.

Application scenarios and development content

IR209

Early hot spot and open flame detection outdoors/indoors

Minimum input and technical route
LWIR/MWIR L2/L3;T08+T19
target output
Fire point, flame, persistence and alarm
Implementation
Fire scene data required
critical acceptance
Different fire source/reflection/thermal equipment layering, event Recall
IR210

Searching for people and heat sources under smoke cover

Minimum input and technical route
LWIR L3;T07+T08
target output
Person/heat source boxes, trajectories and confidence
Implementation
Fire scene data required
critical acceptance
Visibility/smoke density/distance stratification, missed detection rate
IR211

Fire spread front and burned area tracking

Minimum input and technical route
UAV/Fixed MWIR/LWIR L3/L4;T08+T14
target output
Line of fire, speed, direction, and geography layers
Implementation
Requires geographical integration
critical acceptance
Fire line position error, update delay
IR212

Troubleshooting of residual fire, smoldering and re-ignition points

Minimum input and technical route
LWIR L2/L3;T08
target output
Hot spots, cooling trends and review checklists
Implementation
Partially reusable
critical acceptance
Comparison with manual peeling/contact temperature measurement
IR213

Thermal runaway fire warning for batteries, stockpiles and warehouses

Minimum input and technical route
LWIR L2/L3;T05+T08
target output
Rising trends, risk stratification and events
Implementation
Need accident sample
critical acceptance
Early detection and omissions are discovered; not solely responsible for firefighting linkage
IR214

Firefighter Thermal Exposure and Equipment Surface Temperature Recording

Minimum input and technical route
LWIR L2/L3;T03+T07
target output
Personnel/equipment surface temperature and exposure time
Implementation
Need for ethical and safe design
critical acceptance
Compare to wearable sensors; not equivalent to core body temperature
IR215

Observation of sprinkler, fire hose and cooling coverage effects

Minimum input and technical route
LWIR L2/L3;T03+T05
target output
Cooling zones, cooling rates and coverage gaps
Implementation
Requires controlled testing
critical acceptance
Area coverage compared to flow/temperature points
IR216

Review of building hot spots after fire disposal

Minimum input and technical route
LWIR L2/L4;T08+T15
target output
Structural surface hot spots and spatial locations
Implementation
Requires structural professional review
critical acceptance
Positioning error, review consistency; does not replace structural safety appraisal

Information required before project evaluation

  • Target equipment/object, site conditions, business processes and follow-up actions to be taken
  • Infrared camera, lens, spectral band, installation distance, field of view, resolution and data interface
  • Original samples and collection parameters under normal, abnormal, boundary and interference conditions
  • Reference truth values and annotation specifications for temperatures, parts, states, or events
  • Target platform, network, interface, storage, latency and operating resource constraints
  • False positives, missed negatives, manual review, linkage, failure handling and acceptance thresholds

Implementation and delivery methods

  1. Project input confirmationCheck camera, spectral band, bit depth, SDK, environmental conditions, sample and acceptance true value.
  2. Sample verificationVerify key processing links, applicable conditions and abnormal working conditions, and determine the development scope and acceptance methods.
  3. Algorithm development and integrationImplement data parsing, algorithms, quality gating, interfaces and target platform deployment.
  4. Test acceptance and handoverRetest according to the agreed test set and target platform, and hand over the deliverables, test results and applicable conditions.
  • Requirements and technical solutions, input and output and interface field definitions
  • Algorithm library, model or SDK/API; delivery form is confirmed in the project plan
  • Sample program, parameter configuration, error status and calling instructions
  • Test set version, indicator definition, stratification results and failed sample records
  • Target platform adaptation, resource usage and running delay records
  • Version, dependencies, license, reproduction steps and applicable conditions description

Acceptance design

Each scenario establishes independent test cases according to "key acceptance". When sharing models across scenarios, results are reported separately for each scenario, distance, load, environment, and target size, supplemented by overall statistics.

When high-risk alarms or controls are involved, the algorithm output is used for review or linkage judgment; safety functions, regulatory responsibilities, and automatic disposal require separate design and acceptance.

Frequently Asked Questions for Enterprise Customers

Can I purchase directly based on one of the scenes?

Can be evaluated first as a separate work package. The formal scope should describe the device, data, target objects, environment, interfaces, delivery form, and acceptance thresholds.

Can it be started when there are no abnormal samples?

The data interface, normal baseline, acquisition plan and simulation/controlled test design can be completed first; the abnormal detection rate and fault classification effect can be evaluated after obtaining sufficient abnormal true values.

Can the algorithm directly trigger alarms or equipment actions?

Duration, deduplication, quality gating, manual review, communication failure and safety interlocking need to be designed based on business risks. High-risk actions should be activated after completion of independent safety mechanisms and on-site acceptance.

Project consultation

Define the Development Scope with Samples and Device Requirements

Fire, early stage fire and fire protection facilities infrared vision development services

Please describe the task object, original picture or video, target indicators, device platform, interface and sample situation.

Phone: 13910119357
xuzhiyang0928@gmail.com

The information filled in will only be used for evaluation and contact for this project. Please do not submit unauthorized personal information or sensitive data.