Enterprise application areas D23

Infrared vision development services for tanks, pipelines, valves and industrial leaks

Targeted at equipment manufacturers, system integrators and enterprise R&D related to "storage tanks, pipelines, valves and industrial leaks", it provides infrared data evaluation, algorithm development, equipment/platform integration and test acceptance, covering 8 types of enterprise application scenarios.

Service scope and implementation plan

direction numberD23
Demand scenario8 items
main inputLWIR L2/L3;LWIR L2/L4;L4
Typical routeT02、T04、T05、T03、T15、T19、T14、T20

The project scope is determined based on samples, equipment, working conditions and written indicators; general modules, special models and multi-sensor integration are configured according to the evaluation results.

Application scenarios and development content

IR177

Tank Level and Floating Pan Status Thermal Boundaries

Minimum input and technical route
LWIR L2/L3;T02+T04
target output
Candidates for liquid level line and floating plate anomalies
Implementation
Requires working condition verification
critical acceptance
Compare with liquid level gauge/can opening record, position error
IR178

Candidates for insulation under tank wall insulation defects, deposits and corrosion

Minimum input and technical route
LWIR L2/L3;T02+T05
target output
Thermal anomaly areas and review sequencing
Implementation
Multi-means truth value required
critical acceptance
Versus UT/CUI check, POD
IR179

Damaged heat pipe insulation and thermal bridging of brackets

Minimum input and technical route
LWIR L2/L4;T03+T15
target output
Defect area, area and spatial coordinates
Implementation
Partially reusable
critical acceptance
Area IoU, positioning error, environment stratification
IR180

Valve internal leakage and abnormal valve position thermal mode

Minimum input and technical route
LWIR L2/L3;T05
target output
Pre- and post-valve thermal patterns and status candidates
Implementation
Required working condition true value
critical acceptance
Compare with flow/pressure difference/maintenance results
IR181

Flange and mechanical seal liquid leakage heat traces

Minimum input and technical route
LWIR L2/L3;T02+T19
target output
Wet Zone/Leak Candidates, Spreads and Events
Implementation
Scenario data required
critical acceptance
Minimum leakage, false alarms/day, discovery latency
IR182

Pipe blockage, wax build-up and material accumulation thermal modes

Minimum input and technical route
LWIR L2/L3;T05
target output
Temperature zone and blockage location candidates
Implementation
Heat transfer/working condition model required
critical acceptance
Compare with pigging/pressure difference/pipe opening results
IR183

Buried thermal pipe network leakage drone/vehicle screening

Minimum input and technical route
LWIR L2/L4;T14
target output
Surface thermal anomalies, GIS coordinates and review points
Implementation
Seasonal model required
critical acceptance
Excavation true value, positioning P95, false alarm/km
IR184

Pipe network anomaly heat map associated with maintenance work orders

Minimum input and technical route
L4;T05+T20
target output
Assets, Exceptions, History and Priorities
Implementation
Requires business integration
critical acceptance
Asset matching rate, work order hit rate, audit completeness

Information required before project evaluation

  • Target equipment/object, site conditions, business processes and follow-up actions to be taken
  • Infrared camera, lens, spectral band, installation distance, field of view, resolution and data interface
  • Original samples and collection parameters under normal, abnormal, boundary and interference conditions
  • Reference truth values and annotation specifications for temperatures, parts, states, or events
  • Target platform, network, interface, storage, latency and operating resource constraints
  • False positives, missed negatives, manual review, linkage, failure handling and acceptance thresholds

Implementation and delivery methods

  1. Project input confirmationCheck camera, spectral band, bit depth, SDK, environmental conditions, sample and acceptance true value.
  2. Sample verificationVerify key processing links, applicable conditions and abnormal working conditions, and determine the development scope and acceptance methods.
  3. Algorithm development and integrationImplement data parsing, algorithms, quality gating, interfaces and target platform deployment.
  4. Test acceptance and handoverRetest according to the agreed test set and target platform, and hand over the deliverables, test results and applicable conditions.
  • Requirements and technical solutions, input and output and interface field definitions
  • Algorithm library, model or SDK/API; delivery form is confirmed in the project plan
  • Sample program, parameter configuration, error status and calling instructions
  • Test set version, indicator definition, stratification results and failed sample records
  • Target platform adaptation, resource usage and running delay records
  • Version, dependencies, license, reproduction steps and applicable conditions description

Acceptance design

Each scenario establishes independent test cases according to "key acceptance". When sharing models across scenarios, results are reported separately for each scenario, distance, load, environment, and target size, supplemented by overall statistics.

When high-risk alarms or controls are involved, the algorithm output is used for review or linkage judgment; safety functions, regulatory responsibilities, and automatic disposal require separate design and acceptance.

Frequently Asked Questions for Enterprise Customers

Can I purchase directly based on one of the scenes?

Can be evaluated first as a separate work package. The formal scope should describe the device, data, target objects, environment, interfaces, delivery form, and acceptance thresholds.

Can it be started when there are no abnormal samples?

The data interface, normal baseline, acquisition plan and simulation/controlled test design can be completed first; the abnormal detection rate and fault classification effect can be evaluated after obtaining sufficient abnormal true values.

Can the algorithm directly trigger alarms or equipment actions?

Duration, deduplication, quality gating, manual review, communication failure and safety interlocking need to be designed based on business risks. High-risk actions should be activated after completion of independent safety mechanisms and on-site acceptance.

Project consultation

Define the Development Scope with Samples and Device Requirements

Infrared vision development services for tanks, pipelines, valves and industrial leaks

Please describe the task object, original picture or video, target indicators, device platform, interface and sample situation.

Phone: 13910119357
xuzhiyang0928@gmail.com

The information filled in will only be used for evaluation and contact for this project. Please do not submit unauthorized personal information or sensitive data.