Enterprise Application Area D22

Optical Gas Imaging and Emission Monitoring Infrared Vision Development Services

For "optical gas imaging and emission monitoring" related equipment manufacturers, system integrators and enterprise R&D, it provides infrared data evaluation, algorithm development, equipment/platform integration and test acceptance, covering 8 types of enterprise application scenarios.

Service scope and implementation plan

direction numberD22
Demand scenario8 items
main inputSpecial MWIR L3; Special LWIR L3; Corresponding special spectrum band L3;
Typical routeT09、T19、T20

The project scope is determined based on samples, equipment, working conditions and written indicators; general modules, special models and multi-sensor integration are configured according to the evaluation results.

Application scenarios and development content

IR169

Methane and hydrocarbon leak plume candidate detection

Minimum input and technical route
Special MWIR L3;T09
target output
Plume masking, duration and equipment association
Implementation
Requires dedicated camera/model
critical acceptance
Controlled release test, detection rate, false alarm rate
IR170

SF₆ Leak Optical Imaging

Minimum input and technical route
Special LWIR L3;T09
target output
Air plumes, leak point candidates and fragments
Implementation
Narrowband equipment required
critical acceptance
Controlled release, distance/wind speed/background layering
IR171

Refrigerant leak imaging

Minimum input and technical route
Special LWIR L3;T09
target output
Air plume candidates and equipment locations
Implementation
Need to match gas filter
critical acceptance
Compared with the leak detector, the minimum detectable conditions
IR172

Imaging of specific gases such as CO/CO₂/NH₃

Minimum input and technical route
Corresponding to the special spectrum band L3;T09
target output
Air Feather Candidates and Category Configurations
Implementation
One gas and one verification required
critical acceptance
Spectral response, cross gas and environmental background testing
IR173

Air plume movement, direction and origin point retrieval

Minimum input and technical route
OGI video L3;T09+T19
target output
Air plume optical flow, propagation direction and source point candidates
Implementation
Partially reusable optical flow
critical acceptance
Compared with known source/wind field, source point error
IR174

Fixed OGI continuous monitoring and alarm deduplication

Minimum input and technical route
OGI L3;T09+T20
target output
Event, duration, device ID, and evidence
Implementation
Requires system implementation
critical acceptance
False positives/day, online rate, discovery and recovery time
IR175

Quantitative OGI leak rate estimate

Minimum input and technical route
Radiation OGI+special calibration L5;T09
target output
Mass/Volume Leak Rate and Range
Implementation
Requires dedicated quantitative core
critical acceptance
Controlled flow, gas response factors, wind/ΔT/distance stratification
IR176

OGI Joint positioning with point gas sensor

Minimum input and technical route
OGI+sensor L4;T09+T20
target output
Plumes, concentration points and combined risks
Implementation
Requires multi-source integration
critical acceptance
Space-time synchronization, source positioning error, event recall

Information required before project evaluation

  • Target equipment/object, site conditions, business processes and follow-up actions to be taken
  • Infrared camera, lens, spectral band, installation distance, field of view, resolution and data interface
  • Original samples and collection parameters under normal, abnormal, boundary and interference conditions
  • Reference truth values and annotation specifications for temperatures, parts, states, or events
  • Target platform, network, interface, storage, latency and operating resource constraints
  • False positives, missed negatives, manual review, linkage, failure handling and acceptance thresholds

Implementation and delivery methods

  1. Project input confirmationCheck camera, spectral band, bit depth, SDK, environmental conditions, sample and acceptance true value.
  2. Sample verificationVerify key processing links, applicable conditions and abnormal working conditions, and determine the development scope and acceptance methods.
  3. Algorithm development and integrationImplement data parsing, algorithms, quality gating, interfaces and target platform deployment.
  4. Test acceptance and handoverRetest according to the agreed test set and target platform, and hand over the deliverables, test results and applicable conditions.
  • Requirements and technical solutions, input and output and interface field definitions
  • Algorithm library, model or SDK/API; delivery form is confirmed in the project plan
  • Sample program, parameter configuration, error status and calling instructions
  • Test set version, indicator definition, stratification results and failed sample records
  • Target platform adaptation, resource usage and running delay records
  • Version, dependencies, license, reproduction steps and applicable conditions description

Acceptance design

Each scenario establishes independent test cases according to "key acceptance". When sharing models across scenarios, results are reported separately for each scenario, distance, load, environment, and target size, supplemented by overall statistics.

When high-risk alarms or controls are involved, the algorithm output is used for review or linkage judgment; safety functions, regulatory responsibilities, and automatic disposal require separate design and acceptance.

Frequently Asked Questions for Enterprise Customers

Can I purchase directly based on one of the scenes?

Can be evaluated first as a separate work package. The formal scope should describe the device, data, target objects, environment, interfaces, delivery form, and acceptance thresholds.

Can it be started when there are no abnormal samples?

The data interface, normal baseline, acquisition plan and simulation/controlled test design can be completed first; the abnormal detection rate and fault classification effect can be evaluated after obtaining sufficient abnormal true values.

Can the algorithm directly trigger alarms or equipment actions?

Duration, deduplication, quality gating, manual review, communication failure and safety interlocking need to be designed based on business risks. High-risk actions should be activated after completion of independent safety mechanisms and on-site acceptance.

Project consultation

Define the Development Scope with Samples and Device Requirements

Optical Gas Imaging and Emission Monitoring Infrared Vision Development Services

Please describe the task object, original picture or video, target indicators, device platform, interface and sample situation.

Phone: 13910119357
xuzhiyang0928@gmail.com

The information filled in will only be used for evaluation and contact for this project. Please do not submit unauthorized personal information or sensitive data.