Enterprise Application Area D17

Composite materials, honeycomb, bonding and non-destructive testing infrared vision development services

Targeted at equipment manufacturers, system integrators and enterprise R&D related to "composite materials, honeycomb, bonding and non-destructive testing", it provides infrared data evaluation, algorithm development, equipment/platform integration and test acceptance, covering 8 types of enterprise application scenarios.

Service scope and implementation plan

direction numberD17
Demand scenario8 items
main inputL5;L4/L5
Typical routeT10、T15、T20

The project scope is determined based on samples, equipment, working conditions and written indicators; general modules, special models and multi-sensor integration are configured according to the evaluation results.

Application scenarios and development content

IR129

CFRP/GFRP layered flash thermography

Minimum input and technical route
L5;T10
target output
Layered masks, contrast and depth candidates
Implementation
Need to add new core
critical acceptance
Artificial defect test block, POD, depth delamination
IR130

Honeycomb interlayer water accumulation, debonding and core damage

Minimum input and technical route
L5;T10
target output
Water ponding/debonding candidates, area and location
Implementation
Need reference sample
critical acceptance
Compare with ultrasound/X-ray/disassembly inspection
IR131

Screening for lack of glue, weak adhesion and debonding of adhesive joints

Minimum input and technical route
L5;T10
target output
Abnormal bonding area and confidence level
Implementation
Experimental design required
critical acceptance
Compared with mechanical damage/ultrasonic true value, POD
IR132

Coating thickness and thermal response to delamination

Minimum input and technical route
L5;T10
target output
Coating anomalies and thickness regression candidates
Implementation
Requires physical calibration
critical acceptance
Compared with section/eddy current thickness measurement, RMSE
IR133

Composite thermal NDT after impact damage

Minimum input and technical route
L5;T10
target output
Impact Damage Range and Depth Proxy
Implementation
Need impact sample
critical acceptance
Compared with ultrasound C-scan/CT, IoU
IR134

Vibration thermography fatigue crack detection

Minimum input and technical route
L5;T10
target output
Crack heat source and location
Implementation
Requires vibration tooling
critical acceptance
Compared with penetration/micro/ultrasound, minimal cracks
IR135

Automatic scanning of large-area composite materials for wind power/aviation

Minimum input and technical route
L4/L5;T10+T15
target output
Stitching defect maps, 3D locations and coverage
Implementation
Requires robot integration
critical acceptance
Coverage completeness, registration error, POD
IR136

HOT NDT DATA DICONDE ARCHIVE

Minimum input and technical route
L5;T20
target output
Raw sequences, parameters, results and portable archives
Implementation
Requires standard implementation
critical acceptance
Field completeness, cross-software readability and auditing

Information required before project evaluation

  • Target equipment/object, site conditions, business processes and follow-up actions to be taken
  • Infrared camera, lens, spectral band, installation distance, field of view, resolution and data interface
  • Original samples and collection parameters under normal, abnormal, boundary and interference conditions
  • Reference truth values and annotation specifications for temperatures, parts, states, or events
  • Target platform, network, interface, storage, latency and operating resource constraints
  • False positives, missed negatives, manual review, linkage, failure handling and acceptance thresholds

Implementation and delivery methods

  1. Project input confirmationCheck camera, spectral band, bit depth, SDK, environmental conditions, sample and acceptance true value.
  2. Sample verificationVerify key processing links, applicable conditions and abnormal working conditions, and determine the development scope and acceptance methods.
  3. Algorithm development and integrationImplement data parsing, algorithms, quality gating, interfaces and target platform deployment.
  4. Test acceptance and handoverRetest according to the agreed test set and target platform, and hand over the deliverables, test results and applicable conditions.
  • Requirements and technical solutions, input and output and interface field definitions
  • Algorithm library, model or SDK/API; delivery form is confirmed in the project plan
  • Sample program, parameter configuration, error status and calling instructions
  • Test set version, indicator definition, stratification results and failed sample records
  • Target platform adaptation, resource usage and running delay records
  • Version, dependencies, license, reproduction steps and applicable conditions description

Acceptance design

Each scenario establishes independent test cases according to "key acceptance". When sharing models across scenarios, results are reported separately for each scenario, distance, load, environment, and target size, supplemented by overall statistics.

When high-risk alarms or controls are involved, the algorithm output is used for review or linkage judgment; safety functions, regulatory responsibilities, and automatic disposal require separate design and acceptance.

Frequently Asked Questions for Enterprise Customers

Can I purchase directly based on one of the scenes?

Can be evaluated first as a separate work package. The formal scope should describe the device, data, target objects, environment, interfaces, delivery form, and acceptance thresholds.

Can it be started when there are no abnormal samples?

The data interface, normal baseline, acquisition plan and simulation/controlled test design can be completed first; the abnormal detection rate and fault classification effect can be evaluated after obtaining sufficient abnormal true values.

Can the algorithm directly trigger alarms or equipment actions?

Duration, deduplication, quality gating, manual review, communication failure and safety interlocking need to be designed based on business risks. High-risk actions should be activated after completion of independent safety mechanisms and on-site acceptance.

Project consultation

Define the Development Scope with Samples and Device Requirements

Composite materials, honeycomb, bonding and non-destructive testing infrared vision development services

Please describe the task object, original picture or video, target indicators, device platform, interface and sample situation.

Phone: 13910119357
xuzhiyang0928@gmail.com

The information filled in will only be used for evaluation and contact for this project. Please do not submit unauthorized personal information or sensitive data.