Enterprise Application Area D09

Infrared vision development services for pumps, compressors, fans and fluid machinery

For "pumps, compressors, fans and fluid machinery" related equipment manufacturers, system integrators and enterprise R&D, it provides infrared data evaluation, algorithm development, equipment/platform integration and test acceptance, covering 8 types of enterprise application scenarios.

Service scope and implementation plan

direction numberD09
Demand scenario8 items
main inputLWIR L2/L3;LWIR L2
Typical routeT03、T05、T20、T04、T02、T19

The project scope is determined based on samples, equipment, working conditions and written indicators; general modules, special models and multi-sensor integration are configured according to the evaluation results.

Application scenarios and development content

IR065

Pump bearing and mechanical seal temperature rise

Minimum input and technical route
LWIR L2/L3;T03+T05
target output
Part temperatures, trends and anomalies
Implementation
Partially reusable
critical acceptance
Compared to process/contact temperature, temperature P95
IR066

Pump drying, cavitation, and underflow heat mode candidates

Minimum input and technical route
LWIR L2/L3;T05+T20
target output
Thermal patterns, status classification and confidence
Implementation
Requires multiple sources of truth values
critical acceptance
Versus pressure/flow/acoustics, status F1
IR067

Compressor cylinder, interstage and exhaust temperature distribution

Minimum input and technical route
LWIR L2/L3;T03+T04
target output
Regional temperatures, stage differences and trends
Implementation
Partially reusable
critical acceptance
Versus instrument temperature/load, area error
IR068

Joint thermal inspection of fan bearings, belts and motors

Minimum input and technical route
LWIR L2/L3;T04+T05
target output
Multi-part thermal status and exception list
Implementation
Partially reusable
critical acceptance
Component location rate, fault recall
IR069

In-tube flow state and liquid level thermal boundary candidates

Minimum input and technical route
LWIR L2;T02+T04
target output
Thermal Boundary, Level/Flow Candidates
Implementation
Media and wall thickness verification required
critical acceptance
Compared with level meter/flow meter, position error
IR070

Steam/Hot Water Pump Insulation and Leak Heat Traces

Minimum input and technical route
LWIR L2/L3;T02+T19
target output
Leak candidates, diffusion zones and duration
Implementation
Scenario data required
critical acceptance
Minimum leakage, false alarms/day, time to discovery
IR071

Analysis of thermal plumes in air ducts, nozzles and heat dissipation flow fields

Minimum input and technical route
LWIR L2/L3;T05
target output
Plume area, direction and velocity proxies
Implementation
Partially reusable optical flow
critical acceptance
Compare with wind speed/smoke visualization
IR072

Optimization of thermal status rotation of multiple pumps in the same unit

Minimum input and technical route
LWIR L2/L3;T05+T20
target output
Health ranking and review recommendations
Implementation
Need normalization of operating conditions
critical acceptance
Sorting stability, fault hit rate; no direct closed-loop control

Information required before project evaluation

  • Target equipment/object, site conditions, business processes and follow-up actions to be taken
  • Infrared camera, lens, spectral band, installation distance, field of view, resolution and data interface
  • Original samples and collection parameters under normal, abnormal, boundary and interference conditions
  • Reference truth values and annotation specifications for temperatures, parts, states, or events
  • Target platform, network, interface, storage, latency and operating resource constraints
  • False positives, missed negatives, manual review, linkage, failure handling and acceptance thresholds

Implementation and delivery methods

  1. Project input confirmationCheck camera, spectral band, bit depth, SDK, environmental conditions, sample and acceptance true value.
  2. Sample verificationVerify key processing links, applicable conditions and abnormal working conditions, and determine the development scope and acceptance methods.
  3. Algorithm development and integrationImplement data parsing, algorithms, quality gating, interfaces and target platform deployment.
  4. Test acceptance and handoverRetest according to the agreed test set and target platform, and hand over the deliverables, test results and applicable conditions.
  • Requirements and technical solutions, input and output and interface field definitions
  • Algorithm library, model or SDK/API; delivery form is confirmed in the project plan
  • Sample program, parameter configuration, error status and calling instructions
  • Test set version, indicator definition, stratification results and failed sample records
  • Target platform adaptation, resource usage and running delay records
  • Version, dependencies, license, reproduction steps and applicable conditions description

Acceptance design

Each scenario establishes independent test cases according to "key acceptance". When sharing models across scenarios, results are reported separately for each scenario, distance, load, environment, and target size, supplemented by overall statistics.

When high-risk alarms or controls are involved, the algorithm output is used for review or linkage judgment; safety functions, regulatory responsibilities, and automatic disposal require separate design and acceptance.

Frequently Asked Questions for Enterprise Customers

Can I purchase directly based on one of the scenes?

Can be evaluated first as a separate work package. The formal scope should describe the device, data, target objects, environment, interfaces, delivery form, and acceptance thresholds.

Can it be started when there are no abnormal samples?

The data interface, normal baseline, acquisition plan and simulation/controlled test design can be completed first; the abnormal detection rate and fault classification effect can be evaluated after obtaining sufficient abnormal true values.

Can the algorithm directly trigger alarms or equipment actions?

Duration, deduplication, quality gating, manual review, communication failure and safety interlocking need to be designed based on business risks. High-risk actions should be activated after completion of independent safety mechanisms and on-site acceptance.

Project consultation

Define the Development Scope with Samples and Device Requirements

Infrared vision development services for pumps, compressors, fans and fluid machinery

Please describe the task object, original picture or video, target indicators, device platform, interface and sample situation.

Phone: 13910119357
xuzhiyang0928@gmail.com

The information filled in will only be used for evaluation and contact for this project. Please do not submit unauthorized personal information or sensitive data.