Enterprise Application Area D06

Infrared vision development services for batteries, energy storage and charging and discharging systems

For "battery, energy storage and charge and discharge system" related equipment manufacturers, system integrators and enterprise R&D, it provides infrared data evaluation, algorithm development, equipment/platform integration and test acceptance, covering 8 types of enterprise application scenarios.

Service scope and implementation plan

direction numberD06
Demand scenario8 items
main inputLWIR L2/L3; high speed LWIR/MWIR
Typical routeT03、T04、T05、T08、T19、T10、T20

The project scope is determined based on samples, equipment, working conditions and written indicators; general modules, special models and multi-sensor integration are configured according to the evaluation results.

Application scenarios and development content

IR041

Single cell temperature unevenness and hot spot detection

Minimum input and technical route
LWIR L2/L3;T03+T04
target output
Cell Temperature, ΔT, Hotspots and Trends
Implementation
Partially reusable
critical acceptance
Compared with thermocouple/BMS, monomer correlation rate, temperature P95
IR042

Module connectors, busbars and terminals are overheated

Minimum input and technical route
LWIR L2/L3;T04+T05
target output
Connection point temperature rise and load normalization abnormality
Implementation
Partially reusable
critical acceptance
Current working condition stratification, hot spots Recall
IR043

Charge-discharge thermal response curves and consistency grouping

Minimum input and technical route
LWIR L2/L3;T05
target output
Unit/module response curves, clustering and outliers
Implementation
Reusable timing module
critical acceptance
Cycle repeatability, within/between group separability
IR044

Thermal spread test fire point and propagation path analysis

Minimum input and technical route
High speed LWIR/MWIR L2/L3;T08+T19
target output
Starting point, travel time, speed and hot zone
Implementation
Requires dedicated high-speed link
critical acceptance
Aligned to synchronized temperature/voltage records, time offset
IR045

Energy storage cabinet refrigeration airflow and heat accumulation assessment

Minimum input and technical route
LWIR L2/L3;T03+T05
target output
Hot zone in the cabinet, temperature difference between layers and fan status
Implementation
Partially reusable
critical acceptance
Air volume/environment/load stratification, hot zone stability
IR046

Battery pack thermal management cold plate flow path abnormality

Minimum input and technical route
LWIR L2/L5;T03+T10
target output
Flow path temperature difference, clogging/bubble candidates
Implementation
Required working conditions and structural truth values
critical acceptance
Compare with flow/pressure differential/CT or disassembly inspection
IR047

Thermal anomaly screening during the formation stage of battery manufacturing

Minimum input and technical route
LWIR L2/L3;T04+T05
target output
Channel level temperature profiles and abnormal batches
Implementation
Need production data
critical acceptance
Missing negatives/10,000 pieces, false positive rate, tempo and traceability
IR048

Thermal runaway early warning multi-signal fusion

Minimum input and technical route
Temperature + gas + voltage L4;T05+T20
target output
Risk scores, evidence and escalation events
Implementation
Safety systems engineering required
critical acceptance
Independent abuse testing, lead time, and false negatives; no closed-loop shutdown based on vision alone

Information required before project evaluation

  • Target equipment/object, site conditions, business processes and follow-up actions to be taken
  • Infrared camera, lens, spectral band, installation distance, field of view, resolution and data interface
  • Original samples and collection parameters under normal, abnormal, boundary and interference conditions
  • Reference truth values and annotation specifications for temperatures, parts, states, or events
  • Target platform, network, interface, storage, latency and operating resource constraints
  • False positives, missed negatives, manual review, linkage, failure handling and acceptance thresholds

Implementation and delivery methods

  1. Project input confirmationCheck camera, spectral band, bit depth, SDK, environmental conditions, sample and acceptance true value.
  2. Sample verificationVerify key processing links, applicable conditions and abnormal working conditions, and determine the development scope and acceptance methods.
  3. Algorithm development and integrationImplement data parsing, algorithms, quality gating, interfaces and target platform deployment.
  4. Test acceptance and handoverRetest according to the agreed test set and target platform, and hand over the deliverables, test results and applicable conditions.
  • Requirements and technical solutions, input and output and interface field definitions
  • Algorithm library, model or SDK/API; delivery form is confirmed in the project plan
  • Sample program, parameter configuration, error status and calling instructions
  • Test set version, indicator definition, stratification results and failed sample records
  • Target platform adaptation, resource usage and running delay records
  • Version, dependencies, license, reproduction steps and applicable conditions description

Acceptance design

Each scenario establishes independent test cases according to "key acceptance". When sharing models across scenarios, results are reported separately for each scenario, distance, load, environment, and target size, supplemented by overall statistics.

When high-risk alarms or controls are involved, the algorithm output is used for review or linkage judgment; safety functions, regulatory responsibilities, and automatic disposal require separate design and acceptance.

Frequently Asked Questions for Enterprise Customers

Can I purchase directly based on one of the scenes?

Can be evaluated first as a separate work package. The formal scope should describe the device, data, target objects, environment, interfaces, delivery form, and acceptance thresholds.

Can it be started when there are no abnormal samples?

The data interface, normal baseline, acquisition plan and simulation/controlled test design can be completed first; the abnormal detection rate and fault classification effect can be evaluated after obtaining sufficient abnormal true values.

Can the algorithm directly trigger alarms or equipment actions?

Duration, deduplication, quality gating, manual review, communication failure and safety interlocking need to be designed based on business risks. High-risk actions should be activated after completion of independent safety mechanisms and on-site acceptance.

Project consultation

Define the Development Scope with Samples and Device Requirements

Infrared vision development services for batteries, energy storage and charging and discharging systems

Please describe the task object, original picture or video, target indicators, device platform, interface and sample situation.

Phone: 13910119357
xuzhiyang0928@gmail.com

The information filled in will only be used for evaluation and contact for this project. Please do not submit unauthorized personal information or sensitive data.