Enterprise Application Area D05

Wind turbine infrared vision development services

For "wind turbine" related equipment manufacturers, system integrators and enterprise R&D, it provides infrared data evaluation, algorithm development, equipment/platform integration and test acceptance, covering 8 types of enterprise application scenarios.

Service scope and implementation plan

direction numberD05
Demand scenario8 items
main inputLWIR L2/L3;L5;LWIR L2/L5;LWIR L2/L4
Typical routeT04、T05、T03、T10、T15、T02、T06、T14、T20

The project scope is determined based on samples, equipment, working conditions and written indicators; general modules, special models and multi-sensor integration are configured according to the evaluation results.

Application scenarios and development content

IR033

Thermal abnormalities of main bearings, gearboxes and couplings

Minimum input and technical route
LWIR L2/L3;T04+T05
target output
Component temperature rise, left-right difference and trend
Implementation
Partially reusable
critical acceptance
Compared with SCADA/vibration, abnormal recall, advance amount
IR034

Generator and converter power module hotspots

Minimum input and technical route
LWIR L2/L3;T03+T04
target output
Module temperature, hotspot and load normalized trends
Implementation
Partially reusable
critical acceptance
Compared to built-in sensor/load, temperature P95
IR035

Active thermal detection of blade surface debonding

Minimum input and technical route
L5;T10
target output
Debonding candidates, area and depth proxies
Implementation
Need to add new core
critical acceptance
Artificial defect test block, POD, minimum defect
IR036

Blade lightning protection system connection thermal abnormality

Minimum input and technical route
LWIR L2/L5;T03+T10
target output
Connection area thermal response and anomalies
Implementation
Need to test tooling
critical acceptance
Comparison with resistance/continuity test, defective Recall
IR037

Cabin cooling and ventilation path assessment

Minimum input and technical route
LWIR L2/L3;T03+T05
target output
Heat accumulation areas, ventilation status and trends
Implementation
Partially reusable
critical acceptance
Fan status, ambient temperature stratification, regional stability
IR038

Hot spot inspection of tower flanges and cable connection points

Minimum input and technical route
LWIR L2/L4;T04+T15
target output
Junction point temperature, spatial location and inventory
Implementation
Need system integration
critical acceptance
Positioning error, visible coverage, temperature error
IR039

Thermal imaging assists in judging blade icing and melting conditions

Minimum input and technical route
LWIR L2/L4;T02+T06
target output
Ice candidate areas, melting progress and uncertainty
Implementation
Required environment model
critical acceptance
Compare with physical objects/weather conditions, area IoU; does not replace safety criteria
IR040

Wind farm UAV thermal inspection mission planning and review

Minimum input and technical route
RGB-LWIR L4;T14+T20
target output
Routes, asset binding, exception review and reporting
Implementation
Need system integration
critical acceptance
Coverage completeness rate, duplication rate, asset correlation rate

Information required before project evaluation

  • Target equipment/object, site conditions, business processes and follow-up actions to be taken
  • Infrared camera, lens, spectral band, installation distance, field of view, resolution and data interface
  • Original samples and collection parameters under normal, abnormal, boundary and interference conditions
  • Reference truth values and annotation specifications for temperatures, parts, states, or events
  • Target platform, network, interface, storage, latency and operating resource constraints
  • False positives, missed negatives, manual review, linkage, failure handling and acceptance thresholds

Implementation and delivery methods

  1. Project input confirmationCheck camera, spectral band, bit depth, SDK, environmental conditions, sample and acceptance true value.
  2. Sample verificationVerify key processing links, applicable conditions and abnormal working conditions, and determine the development scope and acceptance methods.
  3. Algorithm development and integrationImplement data parsing, algorithms, quality gating, interfaces and target platform deployment.
  4. Test acceptance and handoverRetest according to the agreed test set and target platform, and hand over the deliverables, test results and applicable conditions.
  • Requirements and technical solutions, input and output and interface field definitions
  • Algorithm library, model or SDK/API; delivery form is confirmed in the project plan
  • Sample program, parameter configuration, error status and calling instructions
  • Test set version, indicator definition, stratification results and failed sample records
  • Target platform adaptation, resource usage and running delay records
  • Version, dependencies, license, reproduction steps and applicable conditions description

Acceptance design

Each scenario establishes independent test cases according to "key acceptance". When sharing models across scenarios, results are reported separately for each scenario, distance, load, environment, and target size, supplemented by overall statistics.

When high-risk alarms or controls are involved, the algorithm output is used for review or linkage judgment; safety functions, regulatory responsibilities, and automatic disposal require separate design and acceptance.

Frequently Asked Questions for Enterprise Customers

Can I purchase directly based on one of the scenes?

Can be evaluated first as a separate work package. The formal scope should describe the device, data, target objects, environment, interfaces, delivery form, and acceptance thresholds.

Can it be started when there are no abnormal samples?

The data interface, normal baseline, acquisition plan and simulation/controlled test design can be completed first; the abnormal detection rate and fault classification effect can be evaluated after obtaining sufficient abnormal true values.

Can the algorithm directly trigger alarms or equipment actions?

Duration, deduplication, quality gating, manual review, communication failure and safety interlocking need to be designed based on business risks. High-risk actions should be activated after completion of independent safety mechanisms and on-site acceptance.

Project consultation

Define the Development Scope with Samples and Device Requirements

Wind turbine infrared vision development services

Please describe the task object, original picture or video, target indicators, device platform, interface and sample situation.

Phone: 13910119357
xuzhiyang0928@gmail.com

The information filled in will only be used for evaluation and contact for this project. Please do not submit unauthorized personal information or sensitive data.