Enterprise application field D02

Infrared vision development services for substations, transmission lines and grid assets

Targeted at equipment manufacturers, system integrators and enterprise R&D related to "substations, transmission lines and power grid assets", it provides infrared data evaluation, algorithm development, equipment/platform integration and test acceptance, covering 8 types of enterprise application scenarios.

Service scope and implementation plan

direction numberD02
Demand scenario8 items
main inputLWIR L2/L3; LWIR L2;
Typical routeT03、T04、T08、T14、T02、T06、T15、T05、T20

The project scope is determined based on samples, equipment, working conditions and written indicators; general modules, special models and multi-sensor integration are configured according to the evaluation results.

Application scenarios and development content

IR009

Thermal abnormalities of transformer bushings and terminal blocks

Minimum input and technical route
LWIR L2/L3;T03+T04
target output
Bushing/terminal temperature, phase difference and alarm
Implementation
Partially reusable
critical acceptance
Distance and load stratification, component recall, temperature P95
IR010

Transformer radiator clogged and uneven cooling

Minimum input and technical route
LWIR L2;T03+T04
target output
Heat sink temperature field, cold/hot areas and uniformity
Implementation
Partially reusable
critical acceptance
Versus flow/fan status, area IoU and uniformity error
IR011

Lightning Arrester Thermal Defect Screening

Minimum input and technical route
LWIR L2;T03+T04
target output
Examples of lightning arresters, phase-to-phase temperature differences and abnormal levels
Implementation
Partially reusable
critical acceptance
Same group comparison, reflection elimination, defect recall
IR012

Candidates for abnormal heating of insulator strings and dirty discharges

Minimum input and technical route
LWIR/MWIR L2/L3;T04+T08
target output
Hotspot location, persistence and string numbering
Implementation
Special data required
critical acceptance
Distance to target pixels, discharge condition stratification, false alarm/km
IR013

Overhead conductor tension clamps and deflector hot spots

Minimum input and technical route
Drone LWIR L2/L4;T04+T14
target output
Clamp positioning, temperature difference and geographical coordinates
Implementation
Requires multi-sensor integration
critical acceptance
Geolocation error, hotspot recall, wind/distance stratification
IR014

Thermal anomalies in cable trenches and underground cable paths

Minimum input and technical route
LWIR L2/L4;T02+T14
target output
Anomaly tropics, paths and review points
Implementation
Scenario model required
critical acceptance
Covering soil/surface condition stratification, false alarm area, positioning error
IR015

Drone/robot infrared inspection of station equipment

Minimum input and technical route
RGB-LWIR L4;T04+T06+T15
target output
Device ID, temperature, posture and inspection records
Implementation
Need system integration
critical acceptance
Point arrival rate, device correlation rate, temperature error, missed detection
IR016

Sorting of thermal status of similar equipment in substations

Minimum input and technical route
LWIR L2/L3;T05+T20
target output
Same type equipment baseline, deviation ranking and review list
Implementation
Partially reusable
critical acceptance
Working condition normalization, ranking stability, abnormal recall

Information required before project evaluation

  • Target equipment/object, site conditions, business processes and follow-up actions to be taken
  • Infrared camera, lens, spectral band, installation distance, field of view, resolution and data interface
  • Original samples and collection parameters under normal, abnormal, boundary and interference conditions
  • Reference truth values and annotation specifications for temperatures, parts, states, or events
  • Target platform, network, interface, storage, latency and operating resource constraints
  • False positives, missed negatives, manual review, linkage, failure handling and acceptance thresholds

Implementation and delivery methods

  1. Project input confirmationCheck camera, spectral band, bit depth, SDK, environmental conditions, sample and acceptance true value.
  2. Sample verificationVerify key processing links, applicable conditions and abnormal working conditions, and determine the development scope and acceptance methods.
  3. Algorithm development and integrationImplement data parsing, algorithms, quality gating, interfaces and target platform deployment.
  4. Test acceptance and handoverRetest according to the agreed test set and target platform, and hand over the deliverables, test results and applicable conditions.
  • Requirements and technical solutions, input and output and interface field definitions
  • Algorithm library, model or SDK/API; delivery form is confirmed in the project plan
  • Sample program, parameter configuration, error status and calling instructions
  • Test set version, indicator definition, stratification results and failed sample records
  • Target platform adaptation, resource usage and running delay records
  • Version, dependencies, license, reproduction steps and applicable conditions description

Acceptance design

Each scenario establishes independent test cases according to "key acceptance". When sharing models across scenarios, results are reported separately for each scenario, distance, load, environment, and target size, supplemented by overall statistics.

When high-risk alarms or controls are involved, the algorithm output is used for review or linkage judgment; safety functions, regulatory responsibilities, and automatic disposal require separate design and acceptance.

Frequently Asked Questions for Enterprise Customers

Can I purchase directly based on one of the scenes?

Can be evaluated first as a separate work package. The formal scope should describe the device, data, target objects, environment, interfaces, delivery form, and acceptance thresholds.

Can it be started when there are no abnormal samples?

The data interface, normal baseline, acquisition plan and simulation/controlled test design can be completed first; the abnormal detection rate and fault classification effect can be evaluated after obtaining sufficient abnormal true values.

Can the algorithm directly trigger alarms or equipment actions?

Duration, deduplication, quality gating, manual review, communication failure and safety interlocking need to be designed based on business risks. High-risk actions should be activated after completion of independent safety mechanisms and on-site acceptance.

Project consultation

Define the Development Scope with Samples and Device Requirements

Infrared vision development services for substations, transmission lines and grid assets

Please describe the task object, original picture or video, target indicators, device platform, interface and sample situation.

Phone: 13910119357
xuzhiyang0928@gmail.com

The information filled in will only be used for evaluation and contact for this project. Please do not submit unauthorized personal information or sensitive data.