Hamar hole system alignment instructions
Hole target adapter aligned with reference axis
Verification date: 2026-10-24
View original public information →Facing the roller support seat, taking the angle of the reflective optical lever as the observation route, the residual error of the installation inclination angle is intended to be output. The page is for project evaluation and does not mean that the development has been completed or has been accepted on site.
Fix the incident light and reflector, and calibrate the corresponding relationship between the camera/receiving screen and the angle stage. Self-centering receiver/reflector target and reference axis tooling
Fix the incident light and reflector, and calibrate the corresponding relationship between the camera/receiving screen and the angle stage
Existing algorithmic evidence:A101–A112 only complete analytical synthesis spot and controlled geometry verification; see laser_spot_benchmark.json
The light point detection front-end or timing statistics module can be reused, but the project still needs to add geometric calibration, time synchronization, motion compensation or equipment system integration.
Gaps in this scenario:Optical lever geometry, reflection double angle relationship and incident point movement compensation are required; mirror angle and target translation must be separated. The relationship between the support base and the target mirror needs to be calibrated. The light spot offset needs to be converted into tooling axis deviation
Route-level gaps:Optical lever geometry, reflection double angle relationship and incident point movement compensation are required; mirror angle and target translation must be separated
"Partially reusable" only describes the relative development volume and does not constitute a commitment to accuracy, tempo, stability or delivery time.
Use an independent angle stage/autocollimator to conduct bidirectional and multi-attitude tests, and report the angle error and return difference. Comparison of mechanical mandrel, dial indicator and independent axis measuring tool
| Acceptance items | Evidence required for project confirmation | Current status |
|---|---|---|
| Inputs and samples | Real device original frames, normal/abnormal samples, exposure and light path conditions, sample grouping and set aside | Not provided, waiting for project input |
| Magnitude and Error | Independent reference value, calibration record, error statistical caliber and mutual confirmation threshold | Not verified |
| Exceptions and boundaries | Anticipated handling of missed detections, false detections, overexposure, occlusion, reflection, out-of-view and communication abnormalities | To be defined |
| System integration | Interface, time synchronization, deployment platform, tempo, log, version and continuous running record | Not integrated |
The source supports measurement principles or similar applications; the module combination, device and acceptance method in this scenario are engineering derivation, and product verification has not been completed.
Hole target adapter aligned with reference axis
Verification date: 2026-10-24
View original public information →Laser alignment categories for shafts, equipment and industrial installations
Verification date: 2026-10-24
View original public information →Adjustment of the reflection target in the direction of the support seat
Please describe the task object, original picture or video, target indicators, device platform, interface and sample situation.
Phone: 13910119357