After a prototype demonstration passes, continuous operation and production samples still need verification for the intended use. The demonstration supports results for its inputs, configuration and observation period. Compare completed evidence with the intended scope, then agree on additional tests and responsibilities.
How should samples and operating conditions be arranged?
List sample sources and counts by workpiece, batch, defect and imaging conditions. Distinguish independent workpieces from repeated capture. Agree on operating duration, concurrent tasks, storage and exception recovery. Record missing samples or site conditions separately. Do not assume they are within the accepted scope.
What should continuous operation records contain?
Record start time, processed count, individual results or traceable indexes, errors, resources and recovery events. Explain interruptions, excluded samples and configuration changes. Determine observation coverage from actual start and end times. Do not describe multiple short sessions as one continuous run.
When can a stage be confirmed as complete?
Check the stage's agreed tasks, evidence and issue status item by item. Retain accepted limitations and unfinished items. Later product models, batches, conditions or interfaces still need verification for the affected scope. Do not directly reuse the original demonstration conclusions.
For recording influencing factors, see NIST data collection guidance.