Start the proposed kit with one representative workstation and one type of inspection. List the camera, lens, light, compute unit, power supply, mount and transport case. Plan a trial setup around part size, field of view, working distance and site lighting. List interfaces and accessories still to be checked. Site fit and runtime still require testing.
Specify hardware interfaces
List camera interfaces, image formats, cable lengths, power ratings, startup load and connectors. Plan cable restraints and disconnect points. For batteries or external power supplies, check operating time and recovery from power loss. Measure power use while running the agreed workload.
Check packing and reinstallation
Assign a packing location to each accessory. Protect the lens, cable connectors and mounts that could shift in transit. At the site, assemble the kit using the checklist, and check framing, reference points and sample results. Compare component condition before use and after pack-down.
With representative parts, check missing images, device restarts and cable reconnection. Record recovery, affected settings and items to retest. Confirm the final kit against the agreed interfaces, parts list and site test records.
Related service: Vision algorithms and model engineering.