Start the proposed upgrade with a survey of equipment, software, interfaces, inputs, outputs and operating constraints. Record maintenance permissions, shutdown windows, configuration backups and recovery conditions. Separate known problems from requested additions. Interfaces, workload and site outcomes still require testing.

Run a pilot on limited equipment

Select representative inputs and equipment combinations while keeping the original version recoverable. Check acquisition, algorithms, result receipt, faults and recovery separately. Record equipment and software versions, inputs, actions, outputs and differences. Do not extend pilot findings to all equipment.

Define cutover and rollback conditions

Use actual evidence to agree on shutdown, configuration migration, data backup and cutover steps. Check that old results, states and versions are not mixed with new records. Define stopping conditions, rollback responsibility and checks after recovery. Retain unresolved items before actual cutover.

Deliver current status and evidence

Deliver inventories, the version matrix, pilot reports, procedures and remaining problems. After cutover, check functionality, timing, resources and recovery under the actual workload. Keep original records. Mark equipment, inputs and continuous operating conditions that have not been tested as pending verification.

Related service: Vision software and system integration.