When original equipment records are incomplete, start with a permitted read-only survey. Record nameplate information, hardware revision, system, software, interfaces and current inputs and outputs. Distinguish site observations, device-reported information, historical records and unresolved items. Observed operation alone does not establish compatibility or upgrade acceptance.
List missing records and their impact
List gaps in interface definitions, configurations, drivers, source code, license scope and recovery records. Explain which checks they affect. Confirm available versions and operating permissions with maintainers. Leave support claims without evidence unresolved rather than inferring authorization or replaceability.
Check critical paths in a limited pilot
Under recoverable test conditions, check input, processing, result receipt and fault recovery. Record actions, versions and results. Confirm responsibility and permission before shutdown, wiring changes, parameter changes or data export. Record reasons and impact for items that cannot yet be performed.
Base next steps on evidence
Document known facts, gaps, pilot results and further verification tasks. Recommend replacement, adaptation or further investigation based on completed scope. Keep untested equipment combinations, workloads and long-duration operation pending. Collecting records does not establish completion of the upgrade.
Related service: Vision software and system integration.