Start the proposed joint development with target devices, inputs, interfaces, environment and material supplied by both parties. Agree separately on hardware, firmware, applications, models and production-preparation responsibilities. Record missing design information, drivers, source code or licenses. Prototype and trial-production outcomes still require relevant verification.

Limit the prototype check scope

On representative devices and inputs, check acquisition, processing, results, resources and fault recovery. Keep versions, configuration and original results. Arrange revisions using the problem list. Keep untested inputs, equipment and continuous operating conditions pending. Do not extend demonstration findings to mass-production acceptance.

Check versions and consistency at trial-production handover

For the target batch, associate materials, assembly, programming, configuration, test tools and result records. Check fault diagnosis and retesting after repairs. Hand over production material, fixtures and operating permissions as actually agreed. Recheck affected scope after changes.

Agree on update and maintenance boundaries

Deliver versions, interface definitions, operating instructions, known problems and recovery material. Record responsibilities for updates, rollback, fault support and third-party dependencies. Deployment acceptance requires target inputs, workloads and environment. Retain the status and verification requirements of unfinished items.